The expansion of our Thailand facility is officially complete. The grand opening took place on March 11th, 2022 with Thai cultural celebrations and traditions. The addition to the facility is located on the current KETL premises and has increased manufacturing floor space by 61,400 sq ft (114% increase from our current manufacturing floor space) and now includes an in-house calibration laboratory, failure analysis laboratory, cleanliness testing, and tooling shop.
Order by
Newest on top Oldest on top